Network Overview
Network Coverage and Corridor Status
The European corridors we quote, with typical transit times and the checks run on every carrier.
Last updated: March 2026
0
Carrier Partners
vetted across Europe
0
Countries
DACH, Benelux, Nordics, Baltics
ADR
Classes 3, 5.1, 6.1, 8
acids, caustics, flammables
CMR
Insured incl. ADR
verified on every carrier
Key facts
Vektor Group's European carrier network. Vetted ADR, chemical tanker and temperature-controlled operators across DACH, Benelux, the Nordics and the Baltics, matched to each load.
Operational metrics
Key performance indicators across the network.
Insured carriers
Lined + ISO
Rubber-lined and stainless tanks on request
Trailer Types
6
ADR tanker, rubber-lined, reefer, flatbed, mega, curtainsider
Insurance Verified
100%
All carriers CMR insurance confirmed
License Verified
100%
EU Community Licence checked
Network coverage
Active freight corridors across Europe.
Distances are great-circle distances between the two sites, multiplied by 1.25 for the road network, and transit comes from EU drivers' hours at 650 km a day. Median lane is 1,464 km over 3 days. Ask for any pair and we quote the real routing.
Corridors and transit times
Typical transit times on the corridors we quote.
| Corridor | Freight Types | Transit |
|---|---|---|
| Germany → Netherlands | FTL, Vehicle, Reefer | 1 to 3 days |
| Germany → Belgium | FTL, Vehicle | 1 to 3 days |
| Italy → Scandinavia | FTL, Machinery, Food | 3 to 5 days |
| Poland → Benelux | FTL, Vehicle, General | 2 to 4 days |
| UK → Continental EU | FTL, Customs-cleared | 3 to 6 days |
| Sweden → Norway | FTL, Vehicle | 2 to 4 days |
| DACH → Nordics | FTL, Industrial | 3 to 5 days |
| Baltics → Western EU | FTL | 3 to 5 days |
| France → Northern EU | FTL, ADR, Reefer | 2 to 5 days |
| Spain → Northern EU | FTL, Vehicle | 4 to 7 days |
| ADR & Chemical Tanker Corridors | ||
| Antwerp / Rotterdam ↔ Rhine-Ruhr | ADR 8 tanker. Rubber-lined, stainless, ISO tank | 1 day |
| Rotterdam / Antwerp ↔ Basel | ADR 8 tanker. ISO tank, tunnel-coded routing | 2 days |
| Rhine (Ludwigshafen) ↔ Northern Italy | ADR 8 tanker. Heated tank, Alpine tunnel routing | 2 to 3 days |
| Germany ↔ Poland (Silesia) | ADR 8 tanker. Bulk liquid, ISO tank | 1 to 2 days |
| Benelux ↔ Baltics | ADR 8 tanker. Dedicated tanker, EFTCO wash | 3 to 5 days |
| Germany ↔ Sweden & Finland | ADR 8 tanker. Ferry-cleared ADR, heated | 3 to 5 days |
| Tarragona (Spain) ↔ France / Germany | ADR 8 tanker. Long-haul tanker, stainless | 3 to 5 days |
| Lyon chemical valley ↔ Benelux | ADR 8 tanker. Stainless, ISO tank | 2 days |
| Benelux ↔ United Kingdom | ADR 8 tanker. Customs-cleared ADR tanker | 2 to 4 days |
| Austria ↔ Baltics | ADR 8 tanker. Long-haul tanker, dedicated | 3 to 5 days |

Get a price
Need freight moved?
Checked carriers, Europe, every trailer type.